News

img
Tue, 10/31/2023 - 18:46

TSUULL is ready for autumn winter season

The management of Alisher Navo’i  Tashkent State University of Uzbek Language and Literature checked the readiness of the place of residence of students for the autumn-winter season

In total, 2 generators of 350 kW each were purchased and installed for uninterrupted power supply throughout the season. 
A reserve of 10 tons of diesel fuel has been established for the operation of generators. A 10-ton diesel storage tank has been acquired and installed as appropriate. 
In order to avoid damage to the main wiring in each room, separate high voltage cables 2 by 2.5 inches are laid.